Separate isokinetic EPA Method 13A and heated cascade impactor tests were performed on three cooling towers before and after drift eliminator modifications. The modifications consisted of installation of Munters D-15 eliminators over the existing eliminators. The reduction of drift and corresponding mineral mass emissions was about 80%.

92-10: Reduction of Cooling Tower PM10 Emissions Due to Drift Eliminator

$12.00Price

    View Our Committment to Privacy.

    Contact

    [email protected]

    281.583.4087

    Cooling Technology Institute
    P.O. Box 681807
    Houston, Texas 77268

    Cooling Technology Institute
    3845 Cypress Creek Parkway
    Suite #420
    Houston, Texas 77068