Before proceeding with a thermal upgrade project determine the present, or like new, thermal operating level of the tower relative to the original design conditions. Then, with an evaluation of the components and thermal potential the user can establish the necessary steps to meet his cooling requirements.

83-07: Preplanning for Cooling Tower Upgrading

$12.00Price
  • C.J. McCann, Tower Performance Inc.

View Our Committment to Privacy.

Contact

[email protected]

281.583.4087

Cooling Technology Institute
P.O. Box 681807
Houston, Texas 77268

Cooling Technology Institute
3845 Cypress Creek Parkway
Suite #420
Houston, Texas 77068