Before proceeding with a thermal upgrade project determine the present, or like new, thermal operating level of the tower relative to the original design conditions. Then, with an evaluation of the components and thermal potential the user can establish the necessary steps to meet his cooling requirements.

83-07: Preplanning for Cooling Tower Upgrading

$12.00Price
  • C.J. McCann, Tower Performance Inc.