FGD (Flue gas desulfurization) discharge piping goes in the centre of natural draught cooling tower. For this huge pipe, diameter approx 10,0 m, big hole in the concrete shell is necessary. Technical treatment is different for existing cooling tower and a new building shell.

11-15: Breakthrough Cooling Tower Shell For FGD Discharge Piping

$12.00Price
  • Vladislav Grebik, REKO PRAH, A.s.