This paper discusses the factors that must be considered in deciding not only what treatment program should be employed, but also what the testing, control, and monitoring protocols should look like.  The primary factors that must be considered, in no particular order, are the following: equipment selection, design, metallurgy, and planned operation; critical temperature and flow considerations; available make-up water chemistry and variability; discharge criteria; plant health and safety considerations and availability of ancillary mechanical treatment systems.

10-10: What is The Best Treatment for my Tower?

$12.00Price

    View Our Committment to Privacy.

    Contact

    [email protected]

    281.583.4087

    Cooling Technology Institute
    P.O. Box 681807
    Houston, Texas 77268

    Cooling Technology Institute
    3845 Cypress Creek Parkway
    Suite #420
    Houston, Texas 77068